sent-artykuł_euro24

Further changes to SENT in 2026: Waste and scrap excluded from the system

Published: October 23, 2026

As of October 28, 2026, the transport of 19 types of metal waste and scrap, including iron and steel, aluminium, copper, zinc and lead, no longer requires registration in the SENT system. The exemption applies only to the waste codes specified in the regulation, not to scrap metal as an entire category. Whether a shipment must be registered still depends on the waste code listed in the transport documentation. At Euro24, we continuously update our guidelines for freight forwarders and drivers to ensure that shipments carried out after October 28, 2026, comply with the new rules, while those that began earlier remain subject to the previous regulations.

What changes in the SENT System from October 28, 2026?

The requirement to register shipments of 19 metal waste codes in the SENT system is being removed. On October 12, 2026, the Minister of Finance and Economy signed a regulation amending the regulation on goods subject to the road and rail transport monitoring system and the monitoring of heating fuel trade. The new provisions enter into force on October 28, 2026, and the Ministry describes them as deregulation measures.

SENT (Electronic Transport Supervision System) is a system operated by the Polish National Revenue Administration (KAS) to monitor the transport of selected goods. Registrations are submitted through the Electronic Tax and Customs Services Platform (PUESC).

Waste codes exempt from SENT

The exempted waste codes are taken from the waste catalogue set out in the Annex to the Regulation of the Minister of Climate of January 2, 2020 (Journal of Laws, item 10).

Waste CodeType of WasteWaste Catalogue Group
02 01 10Metal waste02 – Agriculture, horticulture, forestry and food processing
12 01 01Ferrous metal filings and turnings12 – Shaping and physical and mechanical surface treatment of metals
12 01 03Non-ferrous metal filings and turnings12 – Shaping and physical and mechanical surface treatment of metals
15 01 04Metallic packaging15 – Packaging waste
16 01 17Ferrous metals16 – Including dismantling of end-of-life vehicles
16 01 18Non-ferrous metals16 – Including dismantling of end-of-life vehicles
17 04 01Copper, bronze and brass17 – Construction, renovation and demolition
17 04 02Aluminium17 – Construction, renovation and demolition
17 04 03Lead17 – Construction, renovation and demolition
17 04 04Zinc17 – Construction, renovation and demolition
17 04 05Iron and steel17 – Construction, renovation and demolition
17 04 06Tin17 – Construction, renovation and demolition
17 04 07Mixed metals17 – Construction, renovation and demolition
19 01 02Ferrous materials removed from bottom ash19 – Waste management facilities
19 10 01Iron and steel waste19 – Waste management facilities
19 10 02Non-ferrous metal waste19 – Waste management facilities
19 12 02Ferrous metals19 – Waste management facilities
19 12 03Non-ferrous metals19 – Waste management facilities
20 01 40Metals20 – Municipal waste, separately collected fractions

What does this mean for carriers and freight forwarders?

The list is exhaustive. If the waste code specified in the documentation is not included in the table, the shipment must be assessed under the existing rules. Simply describing the cargo as „scrap metal” in the transport order is not sufficient. The freight forwarder should obtain the exact waste code from the client before dispatching the vehicle.

The regulation only concerns obligations under the SENT system. Other regulations governing waste transport, such as waste record-keeping requirements or cross-border waste shipments, are not affected by this amendment.

Why was scrap metal included in SENT, and why is it now being exempted?

Scrap metal was included in the SENT system on February 22, 2022, along with other types of waste. Under the Regulation of the Minister of Finance of January 25, 2022, the system was extended to cover, among other things, waste imported into Poland and transported through its territory between other EU countries. Shipments of waste on the so-called green list (Article 3(2) of Regulation 1013/2006) weighing up to 20 kg were exempt.

The next change came on January 12, 2024. The Regulation of the Minister of Finance of October 9, 2023, extended SENT requirements to 11 types of waste, mainly waste paints, varnishes, solvents and adhesives, including shipments originating in Poland, provided that the consignment weighed at least 1,000 kg or had a volume of at least 1,000 litres.

The proposal to exempt scrap metal was published on the Government Legislation Centre’s website on June 16, 2026. According to the explanatory memorandum, the amendment was requested by the Ministry of Climate and Environment following a recommendation from the Chief Inspectorate for Environmental Protection. It was also supported by the steel industry and the Ministry of Energy.

The reasoning was straightforward: scrap metal is a sought-after secondary raw material in steel production, so there is no economic incentive to abandon it. Furthermore, monitoring its transport does not significantly reduce fiscal or environmental risks.

What does this mean in practice?

ico_Innowacje_euro24

Practical implication, not the literal wording of the regulation: For shipments consisting exclusively of waste covered by the exemption list, SENT-related obligations no longer apply. These include submitting a notification before departure, obtaining a reference number, updating the notification and transmitting geolocation data during transport. For companies that regularly transport scrap metal (e.g. to steelworks and recycling facilities), this means less administrative work for consignors, consignees and carriers, as well as a reduced risk of penalties resulting from formal errors.

Important: The removal of the SENT registration requirement does not exempt companies from other waste management obligations, including record-keeping in the BDO system (Poland’s Waste Database) and the requirement to issue a Waste Transfer Note.

Shipments in progress on October 28 – which rules apply?

For shipments that began before October 28, 2026, and were not completed by that date, the previous regulations continue to apply. The exemption therefore does not take effect while a shipment is already in transit.

Hypothetical example: A shipment of steel scrap (waste code 17 04 05) departs on October 27 and is unloaded on October 29. This shipment must be carried out under the previous rules, with a valid SENT registration and continuous transmission of geolocation data until the transport is completed. The same cargo dispatched on October 28 no longer requires SENT registration.

What should You do before october 28?

  • Verify waste codes in current and planned transport orders, rather than relying solely on descriptions such as „scrap metal” or „metals”.
  • Check mixed loads. If a vehicle carries other goods subject to SENT alongside waste covered by the exemption, the registration requirement for those other goods remains in place.
  • Plan shipments around the changeover date to clearly distinguish which transports are subject to the previous rules and which fall under the new regulations.
  • Update guidelines for freight forwarders and drivers, as well as transport order templates where SENT registration was previously a standard requirement for scrap metal.
Slider_career_euro24.co_856x700px_mobile

Transport Monitoring

Transport monitoring at Euro24 is an advanced logistics service that provides full control over international shipments. With a dedicated Control Tower team operating 24 hours a day, 7 days a week, customers receive real-time updates on the status of their cargo at every stage of transport. The service includes verification of transport documentation, vehicle location tracking and immediate response to unexpected events, such as breakdowns or delays.

Learn more

Slider_monitoring-_euro24.co_856x700px_mobile

Not the only SENT change in 2026: clothing, footwear and textiles 

DateChangeDirection
28 October 2026 19 metal waste and scrap codes exempted from SENT Narrowing 
20 June 2026 Higher thresholds for clothing and footwear; obligation only for imports, intra-Community acquisitions and transit Narrowing 
17 March 2026 Clothing (CN chapters 61 and 62), used clothing (CN 6309 00 00) and footwear (CN chapter 64) brought into SENT Extension 

What rules apply to clothing and footwear after the June amendment? 

OFrom 20 June 2026, a notification is required only for imports from outside the EU, intra-Community acquisitions of goods (WNT in Polish) and transit through Poland. Domestic shipments, intra-Community supplies of goods (WDT in Polish) and exports have been exempted. The thresholds have been raised: 

  • clothing and used clothing: over 31.5 kg gross (previously 10 kg), 
  • footwear: over 64 items (previously 20 items, i.e. 10 pairs), 
  • mixed consignments: total weight of SENT-covered goods over 31.5 kg gross. 

Humanitarian aid and CN codes 6406, 6117 90 00, 6212 90 00 and 6217 90 00 were also exempted. The exemption may be applied by businesses with AEO status or with a cooperation agreement with the Head of KAS, provided they meet the statutory conditions. Goods under customs procedure 42 00 are still subject to notification. 

In both cases the logic is the same: the obligation depends on the classification of the goods – the CN code for clothing, the waste code for scrap – not on their trade name. Failure to submit a required notification for the transport of SENT-covered goods carries a penalty of 46% of the gross value of the goods, but not less than PLN 20,000. 

Learn more about the changes to SENT!

We deliver wherever you need!

We deliver cargo to almost every corner of the world while maintaining European standards of quality, safety and process transparency. Regardless of the destination, you can count on clear communication, regulatory compliance and operational precision at every stage of transport.

Learn more

Further changes to SENT in 2026: Waste and scrap excluded from the system

Summary

From 28 October 2026, the transport of 19 metal waste codes no longer requires a SENT notification, but shipments started earlier are completed under the old rules. The exemption does not cover scrap metal as a category, so the waste code must be checked for every order. Together with the March extension to clothing and footwear and the June narrowing of that obligation, this is the third change to the scope of SENT in 2026 – and a reason to update your internal procedures.

Sources:

Author:

Further changes to SENT in 2026: Waste and scrap excluded from the system
ecovadis