Published: 22 October 2026
To follow a conversation between experienced staff in a freight forwarding department, you need to know about 40 terms: a dozen or so specific to road transport and many more general ones that work the same way in road, air, sea and rail transport. Most mistakes made by people starting out in the transport, freight forwarding and logistics industry come not from unfamiliarity with abbreviations, but from confusing similar concepts: carrier’s liability insurance (known in Poland as OCP) with cargo insurance, or transit time with lead time.
That’s why we’ve prepared a practical PDF document covering essential transport terminology, which you can download for free and keep handy whenever you need it. It’s a useful resource for both those taking their first steps in the TSL (Transport, Shipping and Logistics) industry and those looking to refresh and expand their knowledge of transport terminology.
These four words answer four different questions and usually all apply to a single shipment at the same time. They are not synonyms, although they are often used interchangeably in conversation.
| Term | Question it answers | Meaning |
|---|---|---|
| Freight | How much does it cost? How is the cargo moved? | Originally, the payment to the carrier for transporting the goods. Colloquially, also the service itself (sea freight, air freight, road freight). |
| Transport | What happens to the goods? | The physical movement of goods from point A to point B. The broadest of the four terms. |
| Transit | Which route, and under what customs rules? | Passage through a country that is neither the place of dispatch nor the destination. Also a customs procedure that allows goods to be moved without paying duties and taxes along the way. |
| Forwarding | Who organises it? | Organising the carriage: selecting the carrier, route, documents and deadlines. A freight forwarder does not need to own any vehicles. |

Practical example: a container from Asia travels by intermodal transport, the customer pays sea freight, the leg through Poland is carried out in transit under a T1 document, and the whole operation is organised by a freight forwarder. Who pays the freight is not determined by the carriage itself, but by the Incoterms rule agreed in the sales contract between the buyer and the seller.
In road transport, the price is determined primarily by how much space the load takes up, not by how much it weighs. That is why the first questions in every enquiry concern the number of pallets, their dimensions and whether they can be stacked.

FTL (Full Truckload)
FTL means full truckload transport: the entire trailer is dedicated to a single order. No one adds goods along the way, so there are no additional handling and no stops to collect other customers’ shipments. This is usually the faster and safer option and, when the load fills most of the trailer, also the more cost-effective one.

LTL (Less Than Truckload) and groupage
LTL is part-load transport: the shipment occupies only part of the cargo space and travels together with other customers’ loads. The cost of the trailer is shared between several shipments, which works well for smaller batches of goods.
Groupage consists of loads of low weight or volume – single pallets, cartons, crates – consolidated with shipments from other senders. It is usually charged per pallet space. In practice, LTL and groupage mean a longer delivery time than FTL, because the vehicle collects and delivers several shipments.

LDM (loading metre)
One loading metre (LDM) is one linear metre of trailer floor space across its full usable width. It is the basic pricing unit for part loads. A standard curtainsider trailer has 13.6 LDM.
To prevent a light but bulky load from being priced like small groupage, carriers apply a weight conversion factor. In market practice, one LDM is most often counted as 1,750–1,850 kg – the exact value is set by each carrier’s price list.

EUR pallet
A EUR pallet (known as Euro pallet or EPAL pallet) measures 1200 × 800 mm. Depending on the vehicle type, a standard trailer holds 33 EUR pallets in a single layer (three pallets side by side, with the shorter side across the width of the trailer, in 11 rows). One EUR pallet therefore takes up about 0.4 LDM.
The trailer type is chosen to suit the goods and the loading method. A mistake at this stage usually means a vehicle that cannot be loaded on site.
| Trailer | Features | When to choose it |
| Curtainsider | Tarpaulin trailer with a sliding side curtain. Loading from the side, rear and top. | The most versatile option – most palletised loads. |
| Mega trailer | Higher interior, capacity of about 100 m³. | Light but bulky goods (e.g. packaging, plastic parts). |
| Refrigerated trailer | Insulated body with a refrigeration unit that maintains the set temperature. | Food, pharmaceuticals, chemicals requiring a constant temperature. |
| Isothermal trailer | Insulation only, no refrigeration unit. | Protection against temperature fluctuations on shorter routes – not a substitute for a reefer. |

Oversized load
An oversized load is cargo that exceeds the permitted vehicle dimensions or weight. It requires a permit, an agreed route and often an escort vehicle. Preparing such a transport takes days, not hours, so an enquiry about an oversized load “for tomorrow” is usually unrealistic.
These four terms have direct legal consequences. A mistake in any of them can mean a fine, a lost claim, or a delivery that cannot be completed by the promised date.
The CMR is a transport document issued under the Convention on the Contract for the International Carriage of Goods by Road (CMR Convention). The Convention applies to road carriage for reward where the place of loading and the place of delivery are in two different countries, at least one of which is a party to the Convention. Domestic carriage in Poland is governed by the Polish Transport Law Act (Prawo przewozowe).
The CMR consignment note is issued in three original copies: one for the sender, one for the consignee (it travels with the goods) and one for the carrier. It is the key piece of evidence in any dispute.
ADR is the Agreement concerning the International Carriage of Dangerous Goods by Road, prepared by the United Nations Economic Commission for Europe (UNECE). In the EU, including Poland, its provisions also apply to domestic carriage. It requires a suitably equipped vehicle, marking (orange plates), transport documents and a driver’s ADR certificate. The text of the Agreement is updated every two years.
With every enquiry, it is worth asking straight away for the safety data sheet of the goods. Customers do not always know that their product – paint, a battery, an aerosol – is subject to ADR.
Cabotage is carriage performed entirely within the territory of another country by a foreign carrier, e.g. a Polish truck carrying goods from Hamburg to Cologne. The rules are set out in Regulation (EC) No 1072/2009, as amended under the Mobility Package:
The cooling-off period applies to the vehicle, not the driver. Penalties for illegal cabotage are imposed on the company, and their amount depends on the laws of the country where the inspection took place.

A tachograph records the driver’s driving time, breaks and rest periods. Since 1 July 2026, the obligation to use one and to comply with driving and rest time rules has also covered vehicles with a maximum permissible weight of over 2.5 t up to 3.5 t if they carry out international carriage of goods or cabotage. This does not apply to domestic carriage. Extending the obligation to lighter vehicles is one of the final stages of implementing the Mobility Package, the EU’s set of rules for road transport. For a freight forwarder, this means that when planning an urgent delivery abroad by van, they must factor in the same breaks and limits as for a truck.
The days when “smaller meant greater freedom” are coming to an end. From 1 July 2026, international transport operations using vehicles with a permissible maximum mass exceeding 2.5 tonnes will enter a completely new reality. Mandatory tachographs in light commercial vehicles, strict working time records, and EU regulations on minimum wages will become part of everyday operations for thousands of companies.
These three terms rarely appear in the initial quote, but most often come back in invoice disputes. The common rule: they are agreed in the transport order, before the vehicle sets off.

Pallet exchange means handing the carrier as many empty pallets as arrived loaded. If the order does not specify whether pallet exchange applies and who handles it, someone will end up paying for the missing pallets – usually whoever failed to include the clause.
Empty running is driving without a load, most often on the return journey. The carrier includes it in the rate, which is why routes from which it is hard to find a return load are more expensive than the distance alone would suggest.


Free waiting time is the time for loading or unloading that is already included in the freight rate, usually a set number of hours at each site. Once it runs out, the carrier charges detention (truck detention): a fee for holding the vehicle and driver beyond the free waiting time. The detention rate and the number of free waiting hours are set out in the transport order – negotiating them after the fact is usually a losing battle. In road freight the correct term is detention; demurrage refers to a container held at the port beyond its free time.
The terms in this and the following sections work the same way in road, air, sea and rail transport. We start with roles, because they determine who is responsible for what.

A freight forwarder organises the carriage: selects the carrier and the route, and takes care of documents and deadlines. A forwarder does not need to own a single vehicle, because it sells an organised service, not kilometres driven. It is primarily responsible for the careful selection of the contractor and the proper organisation of the carriage.

A carrier performs the carriage and is responsible for the goods from acceptance until delivery.
These are two different contracts and two different scopes of liability. In practice, the line can be blurred: a forwarder that accepts a transport order in its own name and issues its own transport documents may be liable as a carrier. This distinction is exactly where most claims stumble, so it is always worth checking what role a company plays in a given order.
| Role | Who it is | In documents |
|---|---|---|
| Consignor | Orders the carriage and hands over the goods. | sender, consignor |
| Consignee | Receives the goods and signs for the delivery. | consignee |
| Shipper | Physically loads the goods onto the vehicle. Often an external warehouse rather than the sender. | – |
| Subcontractor | A carrier to which another carrier or forwarder has passed the order. | – |
The customer usually does not see the subcontractor in the contract, but it is the subcontractor’s driver standing at the the party responsible for loading. That is why vehicle and driver details are confirmed before loading.
In every mode of transport, the delivery date is made up of several different “times”. The most common mistake is comparing offers that each measure a different stretch.
| Term | Meaning | Watch out for |
|---|---|---|
| Transit time | Time in transit from dispatch to delivery. | Always check whether it includes customs clearance and final delivery to the consignee. |
| Lead time | The full cycle: from placing the order until the goods reach the consignee. | It is longer than transit time – it also includes production, order picking and formalities. |
| ETD (Estimated Time of Departure) | Planned time of departure or sailing. | The key word is “estimated” – these dates change. |
| ETA (Estimated Time of Arrival) | Planned time of arrival. | It most often changes at borders, ports and terminals. |
| Cut-off | The last moment by which the goods and documents must reach the terminal. | In air freight it is counted in hours; in sea freight, missing it usually means waiting for the next sailing, often a week later. |
| Time slot | A time window for loading or unloading at a warehouse. | Arriving outside the slot is often not a minor delay, but a lost day. |
| Slot booking | Registering the vehicle with the warehouse and reserving a loading or unloading slot. | Without slot booking, the vehicle may have to wait, even if it arrived on time. |
The price of carriage is only part of the cost of a shipment. Equally important is what exactly you are paying for, who bears the risk and who will cover any damage.
The freight rate is the price for the carriage alone. It rarely covers everything – terminal handling charges, customs clearance, fuel surcharges or final delivery are often charged separately. With every offer, you need to ask what is included.
Door-to-door means a service from a specified collection point to a specified delivery point, including pre- and on-carriage and formalities. The opposites are port-to-port and airport-to-airport services, which end at the terminal. When comparing offers, check the scope first and the price second.
Chargeable weight (dim weight) is the higher of two values: the actual weight and the volumetric weight. The carrier sells space that it can no longer offer to anyone else, so a light but bulky load pays for the space it occupies.
That is why a carton filled with light packing material can cost as much to ship as a load of steel.
IIncoterms 2020 are 11 rules published by the International Chamber of Commerce (ICC) that determine who pays for each stage of carriage and at what point the risk passes from the seller to the buyer. As of October 2026, the 2020 edition remains in force.
A classic mistake is using FOB for container shipments. A container is handed over at the terminal, not on board the vessel, so for such shipments the ICC recommends FCA. Incoterms do not govern the transfer of ownership of the goods or liability for delay – these are matters for the sales contract.
This is the most important distinction in the entire section on risk.
| OCP (carrier’s liability insurance) | Cargo insurance | |
|---|---|---|
| Who it protects | The carrier | The owner of the goods |
| When it pays out | Only when the carrier is actually liable for the damage | Regardless of whether anyone can be held at fault (within the scope of the selected clause) |
| Up to what amount | Up to the carrier’s limit of liability – in international road carriage, 8.33 SDR per kg of gross weight | Insured value |
| Scope | Defined in the carrier’s policy | Selected through Institute Cargo Clauses A – the broadest, C – the narrowest |
For expensive, lightweight goods, cargo insurance is a practical necessity. For a tonne of electronics worth several hundred thousand PLN, the CMR Convention limit will cover about PLN 42,600, and the rest of the loss will be borne by the owner of the goods.

POD (Proof of Delivery) is a signed proof that the goods have been delivered. In road transport, this role is usually played by the signed CMR consignment note. Many principals require a POD before settling the carrier’s invoice.

A damage report is a description of the damage drawn up in the driver’s presence at the time of delivery. Without it, if the delivery document has been signed without reservations, a claim becomes very difficult.
For shipments from outside the European Union or to third countries, customs formalities can take longer than the journey itself. That is why they are planned as a separate stage of the route.
Customs clearance means declaring goods to the customs authorities and placing them under a procedure, e.g. release for free circulation or export. Without it, non-Union goods cannot legally be placed on the market.
A customs broker submits declarations on the client’s behalf. It is responsible for the correct classification of the goods and the completeness of the documents, so the quality of its work determines how much the importer actually pays.
SAD, the Single Administrative Document, is the historical name of the customs declaration form. Today declarations are submitted electronically, but the name is still used in the industry’s everyday language.
T1 is a transit document for non-Union goods. It allows them to be moved under customs supervision without paying duties and taxes along the way, but only against a financial guarantee. The transit must be discharged at the office of destination. An undischarged T1 means that the duties may be collected from the guarantee and the matter comes back to the declarant – usually after several weeks.
NCTS (New Computerised Transit System) is the system in which transit is opened, tracked and closed.
MRN (Movement Reference Number) is the reference number of a customs operation. It is used to check the operation’s status.
The TIR Carnet is an international transit document used mainly for carriage through non-EU countries. It combines a transport document with a guarantee covering customs duties, and the vehicle must be approved for such carriage and sealed.
EORI is a trader’s identification number in the EU customs system. Without it, a customs declaration cannot be submitted, so it should be obtained before the first import or export.
The CN code (Combined Nomenclature) is an eight-digit classification of goods. It determines the duty rate, the required permits and any restrictions. Detailed rates for a specific code can be checked in the TARIC database (the EU’s 10-digit tariff). Incorrect classification is one of the most costly risks in the entire process, because the customs authority can post-clearance recovery, with interest.
Customs duty is a charge levied on the import of goods from outside the EU. Its amount depends on the CN code, the country of origin and the customs value.
The customs value is usually based on the transaction value shown on the invoice, increased by, among other things, the costs of transport and insurance incurred up to the place where the goods are brought into the customs territory of the EU (Article 71 of the Union Customs Code). Transport costs incurred after the goods have entered the EU are not included in the customs value.
In practice, this means that the chosen Incoterms rule affects how the customs value is determined. When buying on EXW terms, the importer must add the entire cost of transport to the EU border, whereas under CIF or CIP some of these costs are already included in the price.
Customs procedure 42 is the release of goods for free circulation in one EU country with a simultaneous VAT exemption, because the goods go straight to a customer in another Member State as an intra-Community supply. It requires reliable documentation of that supply – otherwise, VAT will have to be accounted for in the country of clearance.
| Abbreviation | Full form | Meaning |
|---|---|---|
| ADR | Accord relatif au transport international des marchandises Dangereuses par Route | carriage of dangerous goods by road |
| CMR | Convention relative au contrat de transport international de Marchandises par Route | international road consignment note |
| EORI | Economic Operators Registration and Identification | a company’s number in the EU customs system |
| ETA | Estimated Time of Arrival | planned arrival |
| ETD | Estimated Time of Departure | planned departure |
| FTL | Full Truck Load | an entire vehicle for one order |
| LDM | Lademeter | loading metre |
| LTL | Less Than Truck Load | part load |
| MRN | Movement Reference Number | customs operation number |
| NCTS | New Computerised Transit System | transit handling system |
| OCP | – (Polish: Odpowiedzialność Cywilna Przewoźnika) | carrier’s liability insurance |
| POD | Proof of Delivery | delivery confirmation |
| SDR | Special Drawing Rights | IMF unit of account in which the CMR limit is calculated |
| T1 | – | external transit document |
To start with, it is worth mastering three groups of terms. The first is the numbers that come up in every conversation: 13.6 LDM, 33 EUR pallets and 8.33 SDR per kilogram. The second is the distinctions where mistakes most often arise: forwarder vs. carrier, OCP vs. cargo insurance, transit time vs. lead time, waiting time vs. demurrage. The third is documents: CMR, T1 and POD, because they decide who pays when something goes wrong.
The rest comes with practice. The terms from the common section will be useful regardless of whether your work begins with road, air, sea or rail freight.
EURO24 is a freight forwarding and transport company based in Rzeszów, operating since 2007. Since 2026, it has handled road, air, sea and rail freight as a multimodal operator. The full Logistics Glossary prepared by the Euro24 team covers about 80 terms, including air, sea and rail freight terminology.
This article is for information purposes only and does not constitute legal or customs advice. Rates, limits and regulations change – for a specific shipment, it is worth confirming the current terms.
Sources:
The transport industry is full of abbreviations and technical terms. Want to better understand the language of logistics? We’ve prepared a TSL terminology guide explaining key concepts related to transport, freight forwarding and logistics. Download the free PDF and keep essential industry knowledge at your fingertips!
Author:

33 EUR pallets in a single layer. A standard curtainsider trailer has a loading length of about 13.6 m (13.6 LDM), and the pallets are placed three abreast in 11 rows. With stacking, more pallets can fit, provided the goods and the trailer height allow it.
A freight forwarder organises the carriage, and a carrier performs it. The forwarder is primarily responsible for the careful selection of the carrier and the proper organisation of the carriage; the carrier is responsible for the goods from acceptance until delivery. However, a forwarder that accepts a transport order in its own name may be liable as a carrier.
Not always. OCP pays compensation only when the carrier is liable for the damage and, as a rule, only up to the CMR Convention limit of 8.33 SDR per kilogram of gross weight (about PLN 42.60/kg at the NBP rate of 2 September 2026). Cargo insurance can cover the insured value of the goods, subject to the policy terms and the selected clause.
Enter reservations on the CMR consignment note and draw up a damage report in the driver’s presence before signing for the delivery. For non-apparent damage, reservations must be sent to the carrier in writing within 7 days of delivery, excluding Sundays and public holidays.
Yes, if its maximum permissible weight exceeds 2.5 t and it carries out international carriage of goods or cabotage – this obligation has applied since 1 July 2026. Vans used exclusively for domestic transport are exempt.
A maximum of 3 within 7 days of unloading an international carriage in the given country. After the cycle ends, the same vehicle may not perform cabotage in that country for 4 days.
Because transit time often covers only the carriage itself. Customs clearance, waiting for a slot, missing slot bookings or delays at the border can lengthen the whole process, which is why, when comparing offers, it is always worth asking what exactly the stated time includes.